Rubber Tech China 2017 Shanghai, September 20-22 stand 3C911

Technical Assistance contract

For this service, MDC Engineering defines and sets up all specifications for each element of a production line, in its entirety, and consults, selects and selected with the client from the possible suppliers. As long as the line contains the VulcanoClean process, MDC Engineering is committed to support the technical acceptance before delivery of each component of the line, installation and commissioning, the "debugging" and training up that the line fulfils the target of the customer's production as a whole.
This support contract is part of a preset time, for example, 6 to 24 months.